| Interface | Buyer input |
|---|---|
| Electrical | Three-phase supply voltage, frequency in Hz and connected load in kW if pumps, fans or tracing are part of the quoted skid; omit invented kW for a passive exchanger. |
| Utilities | Cooling water temperature and quality, steam flow in kg/h if used, compressed air demand only when actuators are included, and drain/vent routing. |
| Controls | PLC interface names for any temperature or flow instruments on the package, plus whether those instruments are buyer-furnished. |